Elf Farm Supplies
  • Home
  • About us
    • Who we are
    • What we do
    • Our products
    • Supporting the local community
    • Community Liaison Committee
      • Overview
      • Information
      • Complaints/Feedback Line
    • Careers
  • Construction
    • What are we doing?
    • Indicative timeframe
    • Construction updates
    • Construction environmental management plan
    • Approval document archive
    • Construction gallery
  • Environmental Reporting
    • Environmental complaints summary
      • Environmental complaints summary archive
    • Environmental reports
    • Approved management plans
  • Announcements
    • Announcements
    • Links
  • Contact us
    • Contact details
    • Send us feedback
    • Complaints procedure
    • Make a complaint
  • Gallery
    • Information sessions gallery
    • Construction gallery
Select Page

tunnel-building-earthworks

Tunnel building earthworks, September 2016

biofilter-area-with-ammonia-scrubber-footings

Biofilter area with ammonia scrubber footings, September 2016

biofilter-wall-footings

Biofilter wall footings, September 2016

biofilter-wall-formwork

Biofilter wall formwork, September 2016

Structural steel for the covered storage area

Structural steel for the covered storage area, November 2016

Excavation of the tunnel area

Excavation of the tunnel area, November 2016

Bio-scrubber tank pits

Bio-scrubber tank pits, November 2016

Bio-scrubber base area

Bio-scrubber base area, November 2016

Overhead view of construction site, November 2016

Overhead view of construction site, November 2016

Covered raw storage area, December 2016

Covered raw storage area, December 2016

6782 – Raw storage area_Dec_2016

The raw storage area completely enclosed, December 2016

6491 – Tunnel and scrubber area Feb 2016

Concreting of the tunnel and scrubber area, February 2017

6728 – Concrete slan for tunnel Feb 2016

The concrete slab for the tunnel area is completed, February 2017

6730 – Tunnel walls prep Feb 2016

Preparing the tunnels area for the building of tunnel walls, February 2017

6886 – tunnel and scrubber overview Feb 2016

Overview of tunnel and scrubber area, February 2017

Tunnel Walls

Work on the tunnel walls continues, May 2017

Five tunnel walls

Five tunnel walls are in place, May 2017

Tunnel floors

All tunnel floors are complete, May 2017

Cooling plantroom structure

The cooling plantroom structure being erected, July 2017

Cooling plantroom structure, complete

The cooling plantroom structure is complete, July 2017

Tunnel roofs

Tunnel roofs are near completion, July 2017

Tunnel wall

The last tunnel wall being poured, July 2017

Scrubber units

The scrubber units have been installed, July 2017

Main Building duct

An air extraction duct being installed on top of the main building, October 2017

Main Building

The structure of the main building is nearly complete, October 2017

Exhaust Tunnels

Pouring to enclose exhaust tunnels, October 2017

Cooling towers

Cooling towers being upgraded

phase-2-and-3-building-has-commenced

Phase 2 and 3 tunnels being constructed

Exhaust-duct-leading-to-biofilter

Exhaust duct installed on top of the building

exhaust-duct-installed-on-top-of-the-building

Exhaust duct installed on top of the building

phase-2-and-3-tunnels-being-constructed

Phase 2 and 3 building has commenced

Elf Farm Supplies

Elf Farm Supplies Pty Ltd
Address: 108 Mulgrave Road, Mulgrave NSW 2756
Telephone: (02) 4577 5000
Email: [email protected]
ABN: 71 131 333 830

Looking for?

  • Our products
  • Making a complaint
  • Statutory requirements
  • Register for updates
  • Community Liaison Committee
© 2019 Elf Farm Supplies