tunnel-building-earthworks
Tunnel building earthworks, September 2016
biofilter-area-with-ammonia-scrubber-footings
Biofilter area with ammonia scrubber footings, September 2016
biofilter-wall-footings
Biofilter wall footings, September 2016
biofilter-wall-formwork
Biofilter wall formwork, September 2016
Structural steel for the covered storage area
Structural steel for the covered storage area, November 2016
Excavation of the tunnel area
Excavation of the tunnel area, November 2016
Bio-scrubber tank pits
Bio-scrubber tank pits, November 2016
Bio-scrubber base area
Bio-scrubber base area, November 2016
Overhead view of construction site, November 2016
Overhead view of construction site, November 2016
Covered raw storage area, December 2016
Covered raw storage area, December 2016
6782 – Raw storage area_Dec_2016
The raw storage area completely enclosed, December 2016
6491 – Tunnel and scrubber area Feb 2016
Concreting of the tunnel and scrubber area, February 2017
6728 – Concrete slan for tunnel Feb 2016
The concrete slab for the tunnel area is completed, February 2017
6730 – Tunnel walls prep Feb 2016
Preparing the tunnels area for the building of tunnel walls, February 2017
6886 – tunnel and scrubber overview Feb 2016
Overview of tunnel and scrubber area, February 2017
Tunnel Walls
Work on the tunnel walls continues, May 2017
Five tunnel walls
Five tunnel walls are in place, May 2017
Tunnel floors
All tunnel floors are complete, May 2017
Cooling plantroom structure
The cooling plantroom structure being erected, July 2017
Cooling plantroom structure, complete
The cooling plantroom structure is complete, July 2017
Tunnel roofs
Tunnel roofs are near completion, July 2017
Tunnel wall
The last tunnel wall being poured, July 2017
Scrubber units
The scrubber units have been installed, July 2017
Main Building duct
An air extraction duct being installed on top of the main building, October 2017
Main Building
The structure of the main building is nearly complete, October 2017
Exhaust Tunnels
Pouring to enclose exhaust tunnels, October 2017
Cooling towers
Cooling towers being upgraded
phase-2-and-3-building-has-commenced
Phase 2 and 3 tunnels being constructed
Exhaust-duct-leading-to-biofilter
Exhaust duct installed on top of the building
exhaust-duct-installed-on-top-of-the-building
Exhaust duct installed on top of the building
phase-2-and-3-tunnels-being-constructed
Phase 2 and 3 building has commenced